Session 5.2
Underground Construction

Chairman:
BAUER Manfred
G. Hinteregger & Söhne Baugesellschaft m.b.H.
9:00 AM
"Fildertunnel" and tunnel to "Ober- und Untertürkheim"
Andreas RATH - PORR Bau GmbH
9:20 AM
Tunnel chain "Granitztal" - longest tunnel system of the "Koralmbahn" on the Carinthian side
Mario GOLGER - HOCHTIEF Infrastructure Austria
9:40 AM
Recycling of tunnel excavation and innovative material logistics at the Brenner Base Tunnel - an example of cooperative collaboration
Konrad BERGMEISTER - Brenner Basis Tunnel BBT-SE
10:00 AM
Humber Crossing - An underground gas pipeline in the UK used as a hydro shield drive
Rainer RENGSHAUSEN - PORR Bau GmbH
10:20 AM
The "Semmering Basistunnel" - The project is fully under construction
Gerhard GOBIET - ÖBB-Infrastruktur AG
10:40 AM
Discussion